GRASSCRETE flying ahead

Construction is currently underway at London Heathrow's new Terminal 5....

Construction is currently underway at London Heathrow's new Terminal 5. Here GRASSCRETE has been selected to line the sediment basins for the diverted Duke of Northumberland River. Selected not only for its flow resistence but its ability to accept vehicular load the 150mm thick type GC2 is being laid to both the invert and side slopes of the scheme.