casestudies - Walls - Bin Stores
| Project |
Midland Quarry Products Ltd, Ellistown, Leicestershire, England |
| Client |
Midland Quarry Products Limited |
| Contractor |
|
| Quantity |
1461 units |
| Type |
BINWALL (Heavy Duty) |
|
 |
On this large application, BINWALL met the clients requirements of:
quick installation
de-mountability for adaption or relocation
allowing free passage of moisture
safe storage of 600 - 700 tonnes of material per bay
competitive whole life cost
With a rapid turnover of materials at this quarry/railhead, the system is required to withstand tipping forces from articulated dump trucks as well as the push forces of wheeled loading shovels. With the walls built direct from the delivery lorry, the system is a structurally successful and cost effective solution. |
|